Site conditions
Net head, design flow, seasonal variation, sediment and altitude.
Turbines, generators and controls need to work as one electromechanical system. Start with the site duty and the boundary between equipment supply, civil works and installation.
Discuss the requirement ↗
Net head, design flow, seasonal variation, sediment and altitude.
Target output, grid or isolated operation, voltage and frequency.
Turbine, generator, governor, valves, control, protection and auxiliaries.
Access constraints, assembly sequence, test requirements and responsibility for commissioning.
Suitable selections depend on head, flow and the operating envelope. Request the proposed duty point and efficiency curve.
Review Francis equipment ↗Evaluate high-head applications through jet arrangement, design flow and generator matching.
Review Pelton equipment ↗Record the civil and electrical interfaces before asking suppliers to quote the same scope.
Use the hydropower RFQ guide ↗| Decision | What to request | Why it matters |
|---|---|---|
| Technical fit | A configuration sheet tied to your application and destination. | Make differences between offers visible. |
| Supply boundary | An itemized scope, exclusions and interface responsibilities. | Avoid missing attachments, auxiliaries or site services. |
| Acceptance | An agreed inspection plan and document list. | Define the evidence needed before shipment. |
| Support | Warranty scope, spare parts list and support contact route. | Plan for the equipment after arrival. |
Send the application, destination, quantity and timing. Include a drawing or site sketch where available. We will discuss the missing information and the scope to be evaluated.
Prepare this inquiry ↗